Sarah Jewett, VP of Strategy at Fervo Energy, explains the learning curve and cost reduction dynamics of drilling wells in new fields.
0:00 / 0:18exact quote · 18.7s
720p mp4 · rendered on demand · StarZero watermark
“The way it works is that the first time they drill That well always takes the longest. They don't know anything about the rock, the area, etc. So those wells always take the longest, they're the most high cost, but then over time, the cost to drill wells in that field, as the learnings increase, drops precipitously.”
quote is from the automated transcript, cleaned for reading:
filler sounds and stutters are removed, nothing is rephrased. names can be misheard
(the analysis reads context, assessments check outside sources). how →
More from Sarah Jewett
AssertionSupported
Jewett: Fervo proved hydraulic fracturing and lateral drilling work in granite
“There was a lot of skepticism. You can't hit those drilling rates in granite. If you can't hit that build rate to a lateral well in granite, you can't do a plug and perf operation, you know, hydraulic fracturing operation in granite in the same way that you ca…”
Sarah JewettMay 21, 2025▶ 33:10Building Fervo's geothermal giant
AssertionOpen · timeframe Dec 2026
Only one company is delivering a 100MW firm clean project in 2026
“There is one company that's building a hundred megawatt firm clean energy project that's going to be delivered in twenty-twenty-six, and that's a geothermal company.”
Sarah JewettMay 21, 2025▶ 38:29Building Fervo's geothermal giant
Insight
Founders must start their next project before the previous one finishes
“I think the next project is always being built before you see a reasonable set of definitive outcomes from the previous project if you know, are really on the entrepreneurial journey.”
Sarah JewettMay 21, 2025▶ 20:20Building Fervo's geothermal giant
Opinion
Jewett: Nuclear industry gained immense marketing momentum despite being historically slow
“The nuclear energy industry has also been slow and sleepy for a long time, but has somehow gained an immense amount of marketing momentum or something over the last few years.”
Sarah JewettMay 21, 2025▶ 38:14Building Fervo's geothermal giant
Disclosure
Jewett: Fervo funded first demonstration with corporate equity
“So this was, we ended up raising
Corporate equity to fund this first demonstration.”
Sarah JewettMay 21, 2025▶ 13:26Building Fervo's geothermal giant
PredictionOpen · timeframe Dec 2028
Jewett: Fervo will deliver 100MW by 2026 and 400MW by 2028
“The first hundred megawatts will be delivered by twenty-twenty-six, and the remaining 400 megawatts will be delivered by twenty-twenty-eight.”
Sarah JewettMay 21, 2025▶ 25:36Building Fervo's geothermal giant
Made with StarZero
Turn any episode into a week of clips.
This entire site, over 100 episodes transcribed, diarized, checked and made playable,
runs on the StarZero media pipeline. Drop in your own episode and the podcast clipper finds the
moments worth sharing, cuts them, captions them, and reframes them for every feed.
We use essential cookies to make the site work. With your permission we
also use analytics cookies (Google Analytics and Mixpanel) to understand
usage and improve StarZero. See our Cookie Policy.