Jay Bombay of Leap discusses the future trajectory of virtual power plant dispatch capabilities on the distribution grid.
0:00 / 0:24exact quote · 24.2s
720p mp4 · rendered on demand · StarZero watermark
“I think VPPs have quite a unique role to play in helping alleviating those very localized pain points. And we're not even there right now. We're just talking system wide capacity is pretty much like the limit as to how much VPPs have been able to contribute in a meaningful way. But I think that's going to go very like local and very granular, very real time by the time we get to five to 10 years.”
quote is from the automated transcript, cleaned for reading:
filler sounds and stutters are removed, nothing is rephrased. names can be misheard
(the analysis reads context, assessments check outside sources). how →
More from Jay Bombay
Insight
Bombay: Utility and regulator trust is the biggest roadblock for DER proliferation
“It's probably one of the biggest challenges to the DER industry, which is trust from the utility and regulator side on embracing DERs and really accepting them as a reliable resource, whether it's for capacity or for localized capacity I think getting, establi…”
Jay BombayNov 16, 2023▶ 47:00AI in the real world: Solar forecasting, EVs, and virtual power plants
Made with StarZero
Turn any episode into a week of clips.
This entire site, over 100 episodes transcribed, diarized, checked and made playable,
runs on the StarZero media pipeline. Drop in your own episode and the podcast clipper finds the
moments worth sharing, cuts them, captions them, and reframes them for every feed.
We use essential cookies to make the site work. With your permission we
also use analytics cookies (Google Analytics and Mixpanel) to understand
usage and improve StarZero. See our Cookie Policy.