Assertion certainty 4/5 debate potential 3/5

Dave: Hypothesized project finance for FOAK systems did not exist in 2022

Shreya Dave · The risk of scaling 100x · Nov 27, 2024 · at 11:47

Shreya Dave, CEO of Via Separations, discusses attempting to secure project finance to fund their first commercial industrial deployment in summer 2022.

0:00 / 0:08exact quote · 8.1s
720p mp4 · rendered on demand · StarZero watermark
“What I learned was that the project finance that I had hypothesized was out there for first of a kind systems was not.”

quote is from the automated transcript, cleaned for reading: filler sounds and stutters are removed, nothing is rephrased. names can be misheard (the analysis reads context, assessments check outside sources). how →

More from Shreya Dave

Insight
Dave: Component lead times make 10x scaling take as long as 100x
“The 10 X step, though, easier engineering was going to take just as long as getting to a hundred X because our lead time was defined by system components. When you purchase an electrical box or purchase a pump or purchase a component that has a long lead time,…”
Shreya Dave Nov 27, 2024 ▶ 10:15 The risk of scaling 100x
Assertion Supported
Dave: Via Separations membrane cuts industrial separation energy use by 90%
“Which at the industrial scale is 90% lower energy, fully electrifiable, and more modular and therefore demand responsive.”
Shreya Dave Nov 27, 2024 ▶ 5:17 The risk of scaling 100x
Insight
Dave: Hardware startups must be upfront about first-of-a-kind deployment risks
“When we were negotiating that contract, it was very Explicit to all of us that this was a first commercial system, that this was the first, that, that we'd never done this before, that we'd never delivered a project before. And some might look at that and say,…”
Shreya Dave Nov 27, 2024 ▶ 7:41 The risk of scaling 100x
Disclosure
Dave: Via Separations acted as its own general contractor
“Well, we decided to be our own general contractor so that we could stay very close to the engineering, the EPC, the engineering procurement and construction phases of the project.”
Shreya Dave Nov 27, 2024 ▶ 14:03 The risk of scaling 100x
Disclosure
Dave: Via Separations took on cost overage risk using time-and-materials contracts
“We didn't have a firm fixed price contract. So we were working on a time and materials basis with a number of different partners, all who contributed very important things to the project, which also left us as the sort of general contractor exposed to cost ove…”
Shreya Dave Nov 27, 2024 ▶ 16:27 The risk of scaling 100x
Assertion Not checkable as stated
Dave: Very few climate tech companies operate at commercial scale
“There are very few climate tech companies who can say they're operating at commercial scale and that the customer is accepting the product.”
Shreya Dave Nov 27, 2024 ▶ 20:42 The risk of scaling 100x