Pat Risner, president of South32's Hermosa Project, discusses local employment targets and community economic development in Santa Cruz County, Arizona.
0:00 / 0:11exact quote · 11.1s
720p mp4 · rendered on demand · StarZero watermark
“We've communicated to the local community that we believe the long-term workforce at Hermosa could be greater, 80% or greater people that live in Santa Cruz County today.”
quote is from the automated transcript, cleaned for reading:
filler sounds and stutters are removed, nothing is rephrased. names can be misheard
(the analysis reads context, assessments check outside sources). how →
More from Pat Risner
AssertionSupported
Risner: Hermosa is only advanced mine that can supply US battery-grade manganese
“And it's also the only advanced mine development that could produce a battery-grade manganese to provide battery-grade manganese for the emerging U.S. And North American electric vehicle supply chain.”
Pat RisnerAug 23, 2023▶ 3:47America’s next-generation mining future [partner content]
AssertionSupported
EV battery makers can completely eliminate cobalt by increasing manganese
“One is you can completely displace the cobalt in the battery by increasing the manganese content.”
Pat RisnerAug 23, 2023▶ 5:19America’s next-generation mining future [partner content]
AssertionSupported
Risner: Hermosa is only US mine project producing both zinc and manganese
“We have a world-class zinc deposit and a world-class manganese deposit, so it's the only mine development project in the United States. That would produce two critical minerals designated on the US Geological Survey's critical minerals list, so those being zin…”
Pat RisnerAug 23, 2023▶ 3:29America’s next-generation mining future [partner content]
AssertionPartly supported
Risner: Hermosa mine will require under 600 acres of surface disturbance
“We have devised, ah, Hermosa, or designed Hermosa as an underground operation. We can mine both the manganese and the zinc resource with less than 600 acres of total disturbance, compared to upwards of 10,000 for many other mining projects. And the vast majori…”
Pat RisnerAug 23, 2023▶ 8:29America’s next-generation mining future [partner content]
AssertionNot checkable as stated
Risner: South32 Hermosa Project will support over 2,500 total jobs
“If you look at vendors, suppliers contractors, and induced jobs from increased disposable income, that number's in, in excess of 2500 jobs.”
Pat RisnerAug 23, 2023▶ 12:15America’s next-generation mining future [partner content]
AssertionContradicted
Every Hermosa mine job pays 2.5x the local average household income
“Every job at Hermosa generates two and a half times the current average household income in the county.”
Pat RisnerAug 23, 2023▶ 12:54America’s next-generation mining future [partner content]
Made with StarZero
Turn any episode into a week of clips.
This entire site, over 100 episodes transcribed, diarized, checked and made playable,
runs on the StarZero media pipeline. Drop in your own episode and the podcast clipper finds the
moments worth sharing, cuts them, captions them, and reframes them for every feed.
We use essential cookies to make the site work. With your permission we
also use analytics cookies (Google Analytics and Mixpanel) to understand
usage and improve StarZero. See our Cookie Policy.