Climeworks deployed field reinforcements while simultaneously designing collector retrofit packages

Doug Chan · Building the world’s biggest DAC facility · Jan 8, 2025 · at 16:56

Doug Chan, COO of Climeworks, explains how the company managed hardware module failures during the construction of the Mammoth direct air capture plant in Iceland.

0:00 / 0:22exact quote · 22.6s
720p mp4 · rendered on demand · StarZero watermark
“We decided to continue with the ones that were already there and essentially deploy a field patch or a field reinforcement to kind of strengthen the failure mode that we had seen, but then in parallel also work on an improved design as well. So that we could then roll out essentially a retrofit package at a later date.”

quote is from the automated transcript, cleaned for reading: filler sounds and stutters are removed, nothing is rephrased. names can be misheard (the analysis reads context, assessments check outside sources). how →

More from Doug Chan

Assertion Not checkable as stated
Climeworks faced premature filter failures during Mammoth's serial production
“The filter element, which is the one that experienced the most design change. We were, while we were testing the prototypes, we actually did see some failures that were earlier than we had expected. And that then comes that decision of, all right, we're also d…”
Doug Chan Jan 8, 2025 ▶ 15:41 Building the world’s biggest DAC facility
Insight
Chan: Net-negative carbon removal requires permanent storage, not reuse
“There's plenty of storage around the world, and ultimately, if we want to be negative in our CO₂ removal, we need to be storing it and not reusing it. Otherwise, it's just kind of a circular economy there.”
Doug Chan Jan 8, 2025 ▶ 5:52 Building the world’s biggest DAC facility
Insight
Chan: Scaling direct air capture to billions requires non-recourse debt
“As companies look to get to scale, especially in direct air capture, and once you get to like triple digit, or even triple digit millions, or billions of dollars of capex, debt financing, non-recourse financing is, is ultimately going to be needed.”
Doug Chan Jan 8, 2025 ▶ 8:18 Building the world’s biggest DAC facility
Insight
Chan: CDR buyers waiting for proven deployment creates a vicious cycle
“So, kind of what we're seeing in the industry at the moment is people are kind of waiting to see that CDR can be deployed before they make the commitments as well. So, it's kind of this vicious cycle.”
Doug Chan Jan 8, 2025 ▶ 9:01 Building the world’s biggest DAC facility
Assertion Not checkable as stated
Climeworks financed Mammoth on-balance-sheet and exceeded typical FID offtake volumes
“So, we still kept it on balance sheet, and actually by the time we did get it built and running, it being mammoth what your typical numbers you would expect for off-take contracts by FID, we'd, we'd well exceeded that.”
Doug Chan Jan 8, 2025 ▶ 9:12 Building the world’s biggest DAC facility
Disclosure
Climeworks kept hardware design in-house while EPC built the facility
“So what we did keep in-house was the design of the core hardware, so those collector units that you see, and then also for the process engineering nerds out there, so the core heat and material balance, the process flow diagram, and the process instrumentation…”
Doug Chan Jan 8, 2025 ▶ 12:25 Building the world’s biggest DAC facility
Made with StarZero

Turn any episode into a week of clips.

This entire site, over 100 episodes transcribed, diarized, checked and made playable, runs on the StarZero media pipeline. Drop in your own episode and the podcast clipper finds the moments worth sharing, cuts them, captions them, and reframes them for every feed.