Price-Wright: Building a mining tech company requires end-to-end vertical integration

Erin Price-Wright · The U.S. Can’t Build AI Without These Materials · Jul 23, 2025 · at 41:23

Erin Price-Wright, General Partner at Andreessen Horowitz (a16z), outlines a16z's thesis on investing in hard tech and critical mineral mining.

0:00 / 0:22exact quote · 22.9s
▶ Watch the full episode on YouTube → 720p mp4 · rendered on demand · StarZero watermark
“We actually do believe you have to control every single piece of the entire journey, the entire life cycle of, you know, an atom of metal end to end to actually be able to build a tech company here. This is not about, you know, a point solution for one particular part of the process in order to actually capture the gains and efficiency and build a feasible business. You really have to own the entire process end to end.”

quote is from the automated transcript, cleaned for reading: filler sounds and stutters are removed, nothing is rephrased. names can be misheard (the analysis reads context, assessments check outside sources). how →

More from Erin Price-Wright

Opinion
Elon Musk, SpaceX, and Tesla trained a cohort of hardware-software engineers
“There's definitely a spectrum, and I would frankly really credit Elon Musk, both from the SpaceX and Tesla perspective, with a lot for really training up engineers that have fluency in hardware and software.”
Erin Price-Wright Dec 12, 2024 ▶ 3:12 Jobs of the Future: Where Hardware Meets Software
Prediction Not checkable as stated
Reshoring US manufacturing is impossible without high reliance on autonomy
“And I don't think that's gonna happen With the way sort of labor economics work globally, if a huge part of the way we manufacture in the future is not driven by autonomy.”
Erin Price-Wright Dec 12, 2024 ▶ 10:49 Jobs of the Future: Where Hardware Meets Software
Assertion Contradicted
All robotic arm components currently originate from Shenzhen, China
“Right now, all the components for robotic arms, everything that you might, that might go into an autonomous factory is all coming from Shenzhen.”
Erin Price-Wright Dec 12, 2024 ▶ 11:05 Jobs of the Future: Where Hardware Meets Software
Assertion Partly supported
Price-Wright: Grid interconnection takes a decade; transformers face 20-year backlogs
“Getting a new project onto the grid today, you know, you sign up for interconnection, it could take a decade. There's a backlog of twenty-plus years to get a new transformer.”
Erin Price-Wright Jul 16, 2025 ▶ 4:08 America's Energy Problem: We Need A New Grid
Assertion Partly supported
Price-Wright: Only one US plant produces steel for electrical transformers
“First of all, there's, like, one company that makes these. And there's, like, one plant in the U.S. That produces the right type of steel that you need in order to make these transformers.”
Erin Price-Wright Jul 16, 2025 ▶ 4:22 America's Energy Problem: We Need A New Grid
Prediction Not checkable as stated
Price-Wright: American consumers will reject utility control over home thermostats
“I do think though, okay, pushing back on that, like, I think that the, American consumer will fully organ reject that level of that dictation over how they use that.”
Erin Price-Wright Jul 16, 2025 ▶ 19:41 America's Energy Problem: We Need A New Grid